Research Projects by Keyword: bridges
- Automated Bridge De-icing Pilot Project
- Bridge Construction Practices Using Incremental Launching, NCHRP Project 20-07/Task 229
- Bridge Rails and Approach Railing for Low-Volume Roads in Iowa (TR-592)
- Bridge Vulnerability Assessment and Mitigation Against Explosions
- Curved Girder Bridges with Integral Abutments
- Demonstration Timber Bridge Testing
- Development and Demonstration of Fleet Management Strategies for Timber Bridges
- Development of Acceptable Live Load Deflection Criteria for Various Timber Superstructure and Deck Types
- Development of Bridge Load Testing for Load Evaluation (TR-445)
- Development of LRFD Design Procedures for Bridge Piles in Iowa (TR-573)
- Evaluation of a Bridge Constructed Using Accelerated Construction Practices
- Evaluation of a Bridge Constructed with Ultra High Performance Concrete
- Evaluation of a Post-tension Strengthened Steel Girder Bridge Using FRP Rods/Strands
- Evaluation of a Timber Bridge for the Secondary Road System Using FRP Reinforced Glulam Girders
- Evaluation of I-80 Aluminum Girder Bridge
- Evaluation of the 24th Street Bridge, Interstate 80/29, Council Bluffs, Iowa
- Evaluation of the Buena Vista IBRD Bridge: A Furthering of Accelerated Bridge Construction in Iowa
- Evaluation of the Effectiveness of Glued Laminated Helper Stringers
- Field Evaluation of Methods to Minimize Transverse Glulam Deck Deflection, Phase 2
- Field Evaluation of Timber Preservation Treatments for Iowa Highway Applications (IHRB-05-10)
- Field Testing of Integral Abutments (HR-399)
- Identification and Evaluation of Pavement - Bridge Interface Ride Quality Improvement and Corrective Strategies
- Implementation and Evaluation of Smart Timber Bridge Concepts to Provide Continuous Structural Condition Assessment
- An Integral Abutment Bridge with Precast Concrete Piles (TR-438)
- Laboratory and Field Testing and Evaluation of Precast Bridge Elements
- Literature Review Related to the Potential Integration of Nano-Technology into a Smart Timber Bridge
- Madison County Bridge Evaluation
- Modified Sheet Pile Abutments for Low Volume Bridges (TR-568)
- Monitoring and Evaluation of the Westbound Roadway of the Iowa River Bridge
- Performance Evaluation of Steel Bridges, Phase II (TR-493)
- Preventing Cracking at Diaphragm/Plate Girder Connections in Steel Bridges (TR-393)
- Remote Health Monitoring for Asset Management
- Retrofit Methods of Distortion Cracking Problems in Plate Girder Bridges (TR-436)
- Seismic Performance of an I-Girder to Inverted-Tee Bent Cap Connection
- Short-Term Monitoring of the Saylorville Reservoir Bridge for Wind-Induced Vibrations with Remote, Cellular-Based Notification
- Steel Diaphragms in Prestressed Concrete Girder Bridges (TR-424)
- Testing and Long-Term Monitoring of 9th Street Bridge Over I-235 in Des Moines: Integral Abutments Supported on Steel Pile/Concrete Drilled Shaft in Glacial Clay
- Validation of Structural Health Monitoring Damage Detection Algorithm
