Clinton/Fulton Multimodal Bridge Study Economic Analysis
Researcher(s)
Principal investigator: David Plazak
Project status
Completed
Start date: 12/01/02
End date: 07/31/03
Sponsor(s)/partner(s)
Sponsor(s):Howard R. Green
About the research
Abstract: The Iowa DOT is contracting with a team of consultants led by Howard R. Green to conduct a detailed analysis of alternatives to a 100-year old bridge crossing of the Mississippi River between Clinton, IA and Fulton, IL.
