CTRE is an Iowa State University center, administered by the Institute for Transportation.

Address: 2711 S. Loop Drive, Suite 4700, Ames, IA 50010-8664

Phone: 515-294-8103
FAX: 515-294-0467

Website: www.ctre.iastate.edu/

Iowa State University--Becoming the Best

Guide to Full-Depth Reclamation (FDR) with Cement

Researcher(s)

Principal investigators:

Project status

Completed

Start date: 07/01/16
End date: 04/30/17

Publications

Report: Guide to Full-Depth Reclamation (FDR) with Cement (21.62 mb pdf) May 2017

Sponsor(s)/partner(s)

Sponsor(s): Portland Cement Association

About the research

Abstract:

Sustainable engineering technologies in pavement rehabilitation, such as full-depth reclamation (FDR), could be the answer for agencies in their quest to provide taxpayers with high-quality infrastructure while being good stewards of public funds. Full-depth reclamation of asphalt pavement is a rehabilitation method that involves recycling an existing asphalt pavement and its underlying layer(s) into a new base layer. The FDR process begins with using a road reclaimer to pulverize an existing asphalt pavement and a portion of the underlying base, subbase, and/or subgrade. Usually the pulverized material is uniformly blended with an additional stabilizing material such as cement to provide an upgraded, homogeneous material. Finally, the stabilized material is compacted in place with rollers. The result is a stiff, stabilized base that is ready for a new rigid or flexible surface course. This guide introduces the FDR with cement process and discusses issues related to project selection, design, construction, and testing/quality control.