Accelerated Implementation of Intelligent Compaction Technology for Embankment Subgrade Soils, Aggregate Base, and Asphalt Pavement Materials
Lime stabilization of subgrade FM 156 Fort Worth
Compaction of lime stabilized subgrade using Case padfoot RICM roller FM 156 Fort Worth, TX
Static plate load testing RM 156 Fort Worth, TX
Compaction of lime stabilized subgrade using Case padfoot RICM roller FM 156 Fort Worth, TX
LWD testing by DOT field engineers SR25, West Lafayette, IN
Cement stabilization of sand subgarde US84, Waynesboro, MS
Asphalt surface layer cracking in area with soft support conditions Rt4, Kandiyohi County, MN
LWD testing on lime stabilized compacted subgrade FM 156 Fort Worth, TX
Tensar TX geogrid reinforcement in base layer US12, Marmarth, ND
Geotechnical mobile lab open house US219, Springfield, NY
Geotechnical mobile lab open house US219, Springfield, NY
Subbase layer mapping using Sakai RICM roller before placing HMA Rt4, Wilmar, MN
GPS base station setup FM 156 Fort Worth, TX
Computer display in roller cabin on Dynapac RICM smooth drum roller FM156 Fort Worth, TX
Researcher(s)
Principal investigator: David White, 515-294-1463, djwhite@iastate.edu (project list)
Co-principal investigators:
- Heath Gieselman
- Pavana Vennapusa, Earthworks Engineering Research Center, 515-294-2395, pavanv@iastate.edu (project list)
Student researchers:
- Brad Fleming, 515-294-7302
- Luke Johanson, einar86@iastate.edu
- Rachel Goldsmith, 515-294-2714, rmgold@iastate.edu
- Jiake Zhang, 515-294-4015, zhjiake@gmail.com
- Justin Harland
- Stephen Quist
Project status
Completed
Start date: 09/01/07
End date: 08/01/11
Publications
Reports:
- June 2008, Minnesota Rt4 Field Study Final Report 4.00 mb (*pdf)
- April 2010, A Review of Roller-Integrated Compaction Technologies for Earthworks 1.04 mb (*pdf)
- April 2011, Indiana SR25 Field Study Final Report 2.60 mb (*pdf)
- May 2009, Kansas US69 Field Study Report 3.39 mb (*pdf)
- April 2010, Mississippi US84 Field Study Final Report 7.71 mb (*pdf)
- January 2010, New York US219 Field Study Final Report 4.99 mb (*pdf)
- November 2010, North Dakota US12 Field Study Final Report 4.94 mb (*pdf)
- November 2008, Texas FM156 Field Study Final Report 4.86 mb (*pdf)
*To read pdf files, you may need to download the free Adobe Acrobat Reader.
Sponsor(s)/partner(s)
Sponsor(s):Ammann Construction Equipment
Bomag Americas, Inc.
Case Construction Equipment
Dynapac
Federal Highway Administration Transportation Pooled Fund (TPF-5(128))
Sakai Heavy Industries Ltd.
State DOT Partners: IN, KS, MN, MS, ND, NY, TX
Transtec Group
About the research
Abstract:
A full description of the project is available on the Federal Highway Administration pooled fund study website: http://www.pooledfund.org/Details/Study/359.
CEER team members are involved in the project to provide expertise with compaction monitoring technologies, conduct in-situ testing on field project sites using the Geotechnical Mobile Lab and open houses on field project sites to disseminate project findings, and provide training to agency and industry participants
