Abstracts
Field Monitoring of the Whitetopping Project on M-
By Staton, John
Michigan Department of Transportation
425 W. Ottawa St
Lansing, MI 48909
PH: 517-373-2090
FAX: N/A
E-Mail: STATONJ@mdot.state.mi.us
Problem Statement
N/A
Research Objectives
N/A
Research Method
N/A
Product
This whitetopping project was constructed in 1999. Four sections were constructed: a 6 inch with fibers, a 6 inch without fibers, a 5 inch with fibers and a 3 inch ultra-thin with fibers. The ultra-thin section is starting to break up and longitudinal cracking is occuring in the middle of the lane in parts of the 5 and 6 inch sections.
Completion Date: Dec 31, 2002
Category: Construction Method
Keywords: pavement, performance, whitetopping,
Date Posted: Nov 06, 2001
This website is maintained by Iowa State University's Center for Transportation Research and Education.
Address: 2711 S. Loop Dr, Suite 4700, Ames, Iowa 50010-8664
Phone: 515-294-8103 ~ Fax: 515-294-0467
Questions/Comments: jkcable@iastate.edu