CE 352 Section 1: Operations |
|||||||||
|
Date |
lecture |
readings from text |
beg. pp. |
end pp. |
#pgs |
TOPIC |
|||
|
Jan 12/13 |
Lab 1 |
Town 178 |
|
|
|
Intro., term project, statistics and interpretations |
|||
|
Jan 14 |
1 |
all of chapter 1 |
3 |
33 |
31 |
Introduction; Please scan the website, esp. "A Survey of Career Opportunities in Transportation Engineering" |
|||
|
Jan 16 |
2 |
all of chapter 2 |
35 |
61 |
27 |
Government role in transport |
|||
|
Jan 19/20 |
|
no lab! |
|
|
|
No lab! |
|||
|
Jan 21 |
3 |
all of chapter 3 |
62 |
80 |
19 |
Administration and finance (guest) |
|||
|
Jan 23 |
4 |
section 4-1 |
83 |
84 |
2 |
Transport technology |
|||
|
|
" |
sections 4-3 to 4-6 |
88 |
92 |
5 |
Hwy. vehicle characteristics |
|||
|
|
" |
sections 6-13 to 6-16 |
198 |
209 |
12 |
Driver characteristics |
|||
|
Jan 26/27 |
Lab 2 |
Town 178 |
|
|
|
Studies and queuing theory |
|||
|
Jan 28 |
5 |
sections 5-1 to 5-11 |
136 |
147 |
12 |
Hwy. traffic control devices (guest) |
|||
|
Jan 30 |
6 |
section 8-12 |
280 |
291 |
12 |
Highway capacity studies |
|||
|
|
" |
section 13-1 |
444 |
447 |
4 |
Number of lanes |
|||
|
|
" |
section 12-6 |
405 |
409 |
5 |
Traffic and hwy. design |
|||
|
Feb 2/3 |
Lab 3 |
Town 134 |
|
|
|
Highway capacity |
|||
|
CE 352 Section 2: Design |
|||||||||
|
Date |
lecture |
readings from text |
beg. pp. |
end pp. |
#pgs |
TOPIC |
|||
|
Feb 4 |
7 |
sections 12-9 and 12-10, selected sections of CE 211 lab manual |
411 |
413 |
3 |
Circular curves, deflection angles, curve setup |
|||
|
Feb 6 |
8 |
CE 211 text*, pp. 549-551 |
549* |
551* |
3 |
Spiral curves |
|||
|
Feb 9/10 |
Lab 4 |
Town 178 |
|
|
|
Spiral Calculations and Project Assistance |
|||
|
Feb 11 |
Exam 1 |
covers material through February 3rd |
|
|
|
|
|||
|
Feb 13 |
9 |
section 5-20 to end of chapter 5 |
152 |
173 |
22 |
Rail & air traffic control |
|||
|
Feb 16/17 |
|
Town 134 |
|
|
|
MapInfo Tutorial |
|||
|
Feb 18 |
10 |
4-22 to end of 4 |
120 |
132 |
13 |
Rail equipment |
|||
|
|
" |
section 12-21( note: mistake in book, p. 435, section 12-20 should be 12-21) |
435 |
442 |
8 |
Rail vertical alignment |
|||
|
Feb 20 |
11 |
sections 12-1 to 12-2 |
399 |
401 |
3 |
Road and rail location |
|||
|
|
" |
section 12-4 |
403 |
403 |
1 |
Intro. to geometric design |
|||
|
|
" |
sections 12-7 to 12-19 note: mistake in book, p. 414, section 12-2 should be 12-12 |
409 |
427 |
19 |
Rail design, alignment, curves |
|||
|
Feb 23/24 |
Lab 5 |
Town 134 |
|
|
|
Rail design project |
|||
|
Feb 25 |
12 |
Winter maintenance (guest) |
|||||||
|
Feb 27 |
13 |
sections 13-14 to 13-20 |
456 |
469 |
15 |
Rail cross section |
|||
|
|
" |
section 13-25 to end of ch. 13 |
478 |
485 |
8 |
Rail intersections |
|||
|
Mar 2/3 |
Lab 5 |
Town 134 |
|
|
|
Rail design project (cont.) |
|||
|
Mar 4 |
14 |
all of chapter 17 |
593 |
617 |
25 |
Airport planning and layout |
|||
|
Mar 6 |
15 |
all of chapter 18, |
620 |
642 |
23 |
Airport terminal design |
|||
|
Mar 9/10 |
Lab 5 |
Town 134 |
|
|
|
Rail design project (cont.) |
|||
|
Mar 11 |
16 |
sections 19-1 to 19-6 |
643 |
657 |
15 |
Airport design |
|||
|
Mar 13 |
17 |
sections 4-16 to 4-21 |
111 |
119 |
9 |
Waterborne vessels |
|||
|
CE 352 Section 3: Planning |
|||||||||
|
Date |
Lect |
readings from text |
beg. pp. |
end pp. |
#pgs |
TOPIC |
|||
|
SPRING BREAK, Mar 16-20 |
|||||||||
|
Mar 23/24 |
|
Town 134 |
|
|
|
Airport Design (Rail Design due) |
|||
|
Mar 25 |
Exam 2 |
covers material through March 13th |
|
|
|
|
|||
|
Mar 27 |
18 |
sections 7-1 to 7-11 |
221 |
236 |
16 |
Transportation planning & TSM |
|||
|
|
" |
sections 8-7 to 8-8 |
264 |
277 |
14 |
Urban trans. Development & inventories |
|||
|
Mar 30/31 |
Lab 6 |
Town 134 |
|
|
|
Airport design (cont.) |
|||
|
Apr 1 |
19 |
sections 10-1 to 10-2 |
344 |
346 |
3 |
Plan selection factors |
|||
|
|
" |
sections 10-3 to 10-8 |
346 |
361 |
16 |
B/C analysis |
|||
|
Apr 3 |
20 |
sections 9-1 to 9-7 |
312 |
320 |
9 |
Modeling: introduction |
|||
|
" |
sections 9-1 to 9-7 |
312 |
320 |
9 |
Modeling: trip generation |
||||
|
Apr 6/7 |
Lab 7 |
Town 134 |
|
|
|
Trip generation/regression |
|||
|
Apr 8 |
21 |
sections 9-8 to 9-11 |
320 |
327 |
8 |
Modeling: trip distribution |
|||
|
Apr 10 |
22 |
sections 11-1 to 11-5 |
378 |
390 |
13 |
Traffic impact analysis (guest) |
|||
|
Apr 13/14 |
Lab 8 |
Town 134 |
|
|
|
Gravity model - QRSII,traffic assignment - QRSII |
|||
|
Apr 15 |
23 |
sections 9-15 to end of 9 |
331 |
341 |
11 |
Modeling: traffic assignment |
|||
|
|
" |
sections 9-12 to 9-14 |
328 |
331 |
4 |
Modeling: mode split |
|||
|
Apr 17 |
24 |
|
|
|
|
Global positioning systems |
|||
|
Apr 20/21 |
Lab 9 |
Town 134 |
|
|
|
QRS continued |
|||
|
Apr 22 |
25 |
|
|
|
|
GIS for transportation modeling |
|||
|
Apr 24 |
26 |
|
|
|
|
Project planning |
|||
|
Apr 27/28 |
|
CE352 drag races at Drivers Education Lot (13th and Stange) |
|
|
|
|
|||
|
Apr 29 |
27 |
sections 4-2 to 4-3 |
85 |
88 |
4 |
Energy and the environment |
|||
|
May 1 |
28 |
|
|
|
|
Layout spirals, Section 2 only |
|||
|
FINAL EXAM May 6, 8:00 AM to 9:30 AM (Tentative) |
|||||||||